TM 9-2330-390-14&P2-16. DETACHING FRONT AND REAR DOLLIES FROM SHELTER (SHELTER ONGROUND) (SIDE LIFT OPERATION) (Con’t).All personnel standing on ground MUST stand clear when crossbrace assemblies arebeing stowed in top beams. If a crossbrace assembly is dropped, serious injury ordeath to personnel could result.j.At front and rear, stow crossbrace assem-bly (3) in top beam (2) and retain with detent pin (21).k.At front and rear, push up on two lift cylinderlevers (4) and positioning cylinders lever (5) to fully lowertop beam (2).2-114
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business