TM 9-2330-390-14&P
2-16. DETACHING FRONT AND REAR DOLLIES FROM SHELTER (SHELTER ON
GROUND) (SIDE LIFT OPERATION) (Cont).
g.
At front and rear, use twist lock wrench (Item 3, Appendix D) to loosen nuts (13). Rotate two twist locks
(14) 90° and remove from crossbrace assemblies (3). Rotate twist locks 90° again and remove from top beams (2).
Remove crossbrace assemblies from between top beams.
NOTE
Two extra detent pins are stowed In storage box.
h.
Remove two detent pins (18 and 19 ) and collapse each crossbrace assembly (3). Install detent pin (18)
to secure crossbrace assembly in collapsed position.
i..
Fold two crossbrace brackets (20) over each crossbrace assembly (3).
2-113