TM 9-2330-379-14&P
WHEEL, TIRE, AND TUBE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
5
Wheel and tire (1)
Take off wheel and tire (1).
INSTALLATION
6
Wheel and tire (4)
Place wheel and tire (1) on hub (8).
7
Ten nuts (3)
Using wheel nut socket wrench, screw
nuts (3) on hub studs (7) until snug.
8
Hydraulic jack
a.
Using hydraulic jack (4) lower, lower
adapter.
b.
Take hydraulic jack (4) from under lower
adapter (5).
9 Frame
Ten nuts (3)
Using wheel nut wrench, tighten nuts (3).
NOTE
Have organizational maintenance torque nuts (3) to
450-500 lb ft as part of your after operation PMCS.
TASK ENDS HERE
3-6