TM 9-2330-275-14&P
4-65. ALINING ROD REPLACEMENT (Cont).
b.
INSTALLATION
NOTE
Perform steps 1 through 3 for each parallel alining rod.
Perform steps 4 through 7 for diagonal connecting link (front dolly).
1.
Install rubber bushing (7) and two rubber bushings (14) on alining rod (9).
2.
Install alining rod (9) on boll (8) with washer (6) and new locknut (5).
3.
Install front of alining rod (9) with screw (10), washer (11), spacer (12), washer (13), and new locknut (15).
4.
Install two robber bushings (17) on connecting link (20).
5.
Install bracket (2) on mounting bracket (1) with three new Iockwashers (3) and bolts (4).
6.
Install connecting link (20) on bracket (2) with bolt (16) and new locknut (22).
7.
Install front of connecting link (20) with washer (19), bolt (18), and new locknut (21).
4-176