AIR FORCE.T.O.10M1-7-9-1-1ARMYTM 11-5895-1021-14/1MARINE CORPSTM 08045-15/1example, data link cables W3 should be connected from number 1 data link connectors A and B on the A-Shelter tonumber I data link connectors A and B on an adjacent I- or IA-Shelter. The intercom cable W5 should be connected fromthe intercom C connector adjacent to number 1 data link connectors on the A-Shelter to the intercom H connector on the I-or IA-Shelter. The number 2 data link-intercom combination on the A-Shelter must be connected to a second I- or IA-Shelter in the same manner, and so on, depending on the deployment configuration.e.After connecting cables as described above, go in each shelter and slide XO1-1 (XIO-2 in an IA-Shelter) out ofADP rack and remove power supply access cover.WARNINGWhen the access cover is off, hazards exist due to the rotatingfan blades and the exposed electrical terminals. Ensure theXIO power is turned offf. Set switch SI to shelter identification number determined by cable connections as shown in table 2-4.g.After setting each switch (S1), replace power supply access cover, slide XIO-1 back in place and secure frontpanel fasteners2-13.After completing the cabling and setting switch S1, the ID codes will be correctly set and the intercom directory(section III) will be correct The system software will automatically display the ID code on the screen of each QRU videoindicator. For data link and intercom operating procedures, refer to TIPI II Positional Handbook HB19-EG79. Intercomoperating instructions are given in section III of this manual.2-14.OPERATIONAL CHECKOUT.2-15.The II Segment cannot be operated prior to preparation of the Shelters for use. To prepare the shelters, refer topreparation for use procedures in applicable shelter manuals listed in table 1-1. When preparations are complete, performthe turn on and checkout procedures in accordance with the applicable shelter manual. Turn on and checkout should beperformed in the following sequence.a.Start up power generators (see power unit manual).b.Start up Air Conditioner Group (see T.O. 35E9-170-1).c.Turn on and check out A-Shelter (see T.O. 10M1-7-7-1).d.Turn on and check out I-Shelter (see T.O.10M-7-6-1).e.Turn on and check out IA-Shelter (see T.O. 10M1-7-5-1).f.Perform segment checkout procedures per paragraph 5-3.Change 1 2-9
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business