TM-10-5411-235-13
UNIT TROUBLESHOOTING PROCEDURES
0012 00
Table 3. Unit Support Troubleshooting Procedures
INITIAL SETUP:
Maintenance Level
Materials/Parts
Unit Support
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
1. Loss of door locking.
1. Inspect for debris on door
1. Clean.
casement.
2. Repair as required.
2. Inspect Roller Latch
Assembly.
2. Exterior steps on shelter wall
1. Replace steps.
seized.
3. Excessive moisture on
1. Inspect shelter wall and roof
1. Repair wall or roof.
exterior walls.
for punctures.
END OF WORK PACKAGE