TM 10-5411-200-14T.O. 35E4-177-13-8. (cont)ECUIntakePanelPosition ECU intake panel (6) in frame opening and secure by tighteningfour captive screws (5).SidewallCloseoutPanels1.Position sidewall closeout panel (4) in frame opening bottom firstand secure by tightening twelve captive screws (3).2.Position sidewall closeout panels (2) in frame opening and secure bytightening four captive screws (1).3.Connect ECU ducts and turn on ECU.(Refer to appropriate sheltersystem manual.)3-9.CONTAINER LIFT JACK ASSEMBLY REPLACEMENTThis task covers:a. Removalb.Cleaning, Inspectionc.InstallationINITIALSETUPStandardtoolsGeneral mechanics tool kitPersonnel- 2REMOVAL1.Place sufficient blocks under IS0fitting to prevent settling ofshelter when jack is removed.NOTEStencil on jack indicates handle rotationto raise or lower jack.2. .Remove safety pin (1).3.Rotate handle (2) to lower jack until upper (3) and lower jackattachments (4) will disengage and jack is not supporting shelter.4.Turn locking handle (5) to rotate insert (6) in IS0 fitting (7),5.Remove jack.3-11
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business