TM 10-5411-200-14
T.O. 35E4-177-1
3-8. (cont)
ECU Intake Panel
Position ECU intake panel (6) in frame opening and secure by tightening
four captive screws (5).
Sidewall Closeout Panels
1.
Position sidewall closeout panel (4) in frame opening bottom first
and secure by tightening twelve captive screws (3).
2.
Position sidewall closeout panels (2) in frame opening and secure by
tightening four captive screws (1).
3.
Connect ECU ducts and turn on ECU.
(Refer to appropriate shelter
system manual.)
3-9.
CONTAINER LIFT JACK ASSEMBLY REPLACEMENT
This task covers:
a. Removal
b.
Cleaning, Inspection
c.
Installation
INITIAL SETUP
Standard tools
General mechanics tool kit
Personnel - 2
REMOVAL
1.
Place sufficient blocks under IS0
fitting to prevent settling of
shelter when jack is removed.
NOTE
Stencil on jack indicates handle rotation
to raise or lower jack.
2. .
Remove safety pin (1).
3.
Rotate handle (2) to lower jack until upper (3) and lower jack
attachments (4) will disengage and jack is not supporting shelter.
4.
Turn locking handle (5) to rotate insert (6) in IS0 fitting (7),
5.
Remove jack.
3-11
