TM 10-5411-200-14
T.O. 35E4-177-1
2-21.
OPERATION IN HIGH WINDS.
W A R N I N G
To avoid injury when expanding or closing hinged
sidewall in high winds, use six personnel.
N O TE
TWO personnel are required to perform the
following procedure.
To install the storm configuration
(tie-down installation) kit, use the following
items.
(1) Ground anchor assembly.
(2) Driving rod.
(3) Holding handle.
(4) Driving head.
(5) Tiedown ring.
W A R N I N G
Safety glasses must be worn by personnel when
installing ground anchors.
b.
One person
second person drives
Appendix D.
shall support driving rod with holding handle, while
ground anchor into ground using 12-pound sledge hammer,
2-34