TM 10-5411-200-14T.O. 35E4-177-12-21.OPERATION IN HIGH WINDS.W A R N I N GTo avoid injury when expanding or closing hingedsidewall in high winds, use six personnel.N O TETWO personnel are required to perform thefollowing procedure.To install the storm configuration(tie-down installation) kit, use the followingitems.(1) Ground anchor assembly.(2) Driving rod.(3) Holding handle.(4) Driving head.(5) Tiedown ring.W A R N I N GSafety glasses must be worn by personnel wheninstalling ground anchors.b.One personsecond person drivesAppendix D.shall support driving rod with holding handle, whileground anchor into ground using 12-pound sledge hammer,2-34
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business