TM 10-5411-200-14T.O. 35E4-177-14-22.(cont)3.4.5.6.7.8.9.10.11.12.13.14.15.16.Move receptacle assemblies and stow on hinged endwall.Set circuit breaker CB6 to OFF position.Disconnect and remove three hinged roof area ceiling lights.Stowlight assemblies in fixed ceiling storage brackets.(Refer to para. 3-5)Disengage all latches (1) along hinged sidewall, hinged endwalls,and hinged roof.Remove all removable latches and retain.CAUTIONSupport inner tube while disengaging support strutfrom stowage bracket.Pull lock pins (2) to free support struts (3) from stowage brackets(4) and swing downward.Insert lock pins (2) to secure struts in extended position.Raise hinged roof to full height of struts.Rotate jack handles to lower both expanded side jacks until hingedfloor is clear of hinged endwalls.Swing both hinged endwalls inward to stowed positions.Lower hinged roof.Stow support struts on hinged roof.Slide hinged roof inward with solar bar.Lower jacks to disengage from jack support brackets on hingedsidewall.4-98
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business