TM 10-5410-284-13&PTM 10602A-13&PLIGHTWEIGHT MAINTENANCE ENCLOSURE (LME) 0005 00OPERATION UNDER USUAL CONDITIONS0005 00-29Roll both side walls (1) up to mid-height and secure them with the straps (2) and buckles (3) provided.Remove the base purlins (4) on the side of the structure being lowered to the ground. Then remove thequick release pins (5) holding the lower leg assemblies (6).Gather personnel at the arch frame assemblies (1) and, on command, lift one side of the structure offthe ground. Remove the lower leg assemblies (2) and lower the structure to the ground. Clean the legs(2) if necessary and pack them in the proper transport cover (3). Move personnel to the opposite side ofthe structure and repeat the procedure.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business