TM 10-5410-284-13&P
TM 10602A-13&P
LIGHTWEIGHT MAINTENANCE ENCLOSURE (LME)
0005 00
OPERATION UNDER USUAL CONDITIONS
0005 00-27
Striking the LME. Release the guy lines (1) and disconnect them from the wooden stakes (2). Coil the
guy lines (1). Remove the wooden guy line stakes (2), the wooden stakes securing the bottom of the
fabric assemblies to the ground (3) and the steel tent pins (4) from the frame feet (5). Clean the stakes
and pins and place them in their pin transport bags (6).
Unbuckle the fabric panels (1) from the base (2) and mid-height purlins (3) on the inside of the
structure. Unlace the end fabric panel (4) at the joining of the intermediate and end fabric panels.