TM 10-5410-284-13&PTM 10602A-13&PLIGHTWEIGHT MAINTENANCE ENCLOSURE (LME) 0005 00OPERATION UNDER USUAL CONDITIONS0005 00-17Route the center line guy line (4) around the eave post (5) and tie off the end. Route the mid-roof guyline (6) around the eave post (7) and tie off the end.Pass the web strap (8) through the mid-height buckle (9) and secure. Pass the web strap (10) throughthe mid height buckle (11) and secure.Lift the window flap (12) and attach the hook and pile strap (13). Close the window flap. Pass the base strap (14) through or around something.Repeat the procedure for both sides of the structure.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business