TM 9-2330-390-14&P
5-9.
SIDE LIFT KIT INSTALLATION (Cont).
5.
6.
7.
8.
9.
10.
11.
Install side lift kit positioning cylinders and lift cylinders (see paragraph 4-83 and 4-110).
Bleed hydraulic system (see paragraph 4-112).
Install lanyard assembly with detent pin in existing hole in top beam (see paragraph 4-99).
Install side lift kit data plates according to locations shown in paragraph 1-12 and instructions in
paragraph 4-105.
Install storage box mounting brackets to front dolly axle (see paragraph 4-137).
Install storage box (see paragraph 4-138).
NOTE
Perform step 11 for each of four chain assemblies. Note that two chain assemblies will
be used on left-hand side of shelter; two chain assemblies will be used on right-hand
side of shelter.
Assemble chain assemblies:
(a)
Install shackle (4) with pin (12) on detach-
able chain link (5) at one end of lifting chain
(11).
(b)
Install detachable chain links (7 and 9) on
smaller holes of adapter (8).
(c)
Install axle chain (10) on detachable chain
link (9).
(d)
Install lifting chain (11) and take-up chain
(6) on detachable chain link (7).
5-32