TM 9-2330-390-14&P
CHAPTER 1
INTRODUCTION
Section I. GENERAL INFORMATION
Paragraph
NUMBER
1-1.
1-2.
1-3.
1-4.
1-5.
1-6.
1-7.
1-8.
1-9.
Table 1-1.
Paragraph Title
Scope.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Maintenance Forms, Records, and Reports. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Destruction of Army Materiel to Prevent Enemy Use . . . . . . . . . . . . . . . . . . . . . . . . . .
Preparation for Storage or Shipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Official Nomenclature, Names, and Designations . . . . . . . . . . . . . . . . . . . . . . . . . . .
Reporting Equipment Improvement Recommendations (EIRs) . . . . . . . . . . . . . . . . . .
Warranty Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Safety, Care, and Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Corrosion Prevention and Control (CPC) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Nomenclature Cross-reference List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page
Number
1-1
1-1
1-1
1-1
1-2
1-2
1-2
1-2
1-3
1-2
1-1.
SCOPE.
a.
Type of Manual. Operators, Unit, Direct Support, and General Support Maintenance Manual (Including
Repair Pans and Special Tools Lists).
b.
Equipment Name and Model Number. Dolly Set: Lift, Transportable Shelter, 7½ Ton, M1022A1.
c. Purpose of Equipment.
(1)
The dolly set is designed to provide full ground mobility for International Standard Organization
(ISO) containers and shelters up to 15,000 lb (6810 kg) gross maximum weight.
(2)
The M1022A1 Dolly Set is designed to lift at ends of containers. With the installation of a side lift kit,
the M1022A1 provides both side lift and end lift capabilities.
1-2.
MAINTENANCE FORMS, RECORDS, AND REPORTS.
Department of the Army forms and procedures used for equipment maintenance will be those prescribed by
DA Pam 738-750, The Army Maintenance Management System (TAMMS).
1-3.
DESTRUCTION OF ARMY MATERIEL TO PREVENT ENEMY USE.
For destruction of Army materiel to prevent enemy use, refer to TM 750-244-6.
1-4.
PREPARATION FOR STORAGE OR SHIPMENT.
For information on preparing the dolly set for storage or shipment, refer to Chapter 4, Section XVIII.
1-1
