TM 55-4920-376-14&P
C1
b.
Scrape off loosened surfacing with a scratch brush.
c.
Repeat Steps a and b, as necessary until all finish
has been removed.
Prime with TT-P-636 alkyd primer. Finish with a mix
d.
of TT-E-529 alkyd enamel and Reardon ADMIX in the
Allow 4 to 8 hours to dry.
SHELTER FLOOR PANEL REPLACEMENT
4.9
The shelter floor is 3/8" plywood covered with .020 inch
thick aluminum. To replace a defective or damaged floor, proceed
as follows:
Remove the old
a.
Drill out all the rivets in the flooring.
flooring.
b.
Obtain a replacement Frame Floor Panel, P/N AA4920-7016-
c.
Using the old floor panel as a template, duplicate the
required No. 8(.199) diameter holes in the new floor panel.
Apply GE Silicone construction sealant SE1202, per Federal
d.
Specification TT-S-230 in a 1/16" bead on the below-floor
framework.
e.
Using 1/4 inch sheetmetal screws, fasten the new flooring
in place.
f.
4.10
TENTAGE REPAIR
If in need of repair, the tenting can be patched by the
following procedure:
a.
Using a piece of material per MIL-C-20696 Type 2 in an
appropriate color, cut out a patch 1 inch wider on all
sides than the tear to be mended.
b.
Apply 3M Compound EC 971 Industrial Adhesive (NSN 8040-
13