TM 10-8340-243-13&P
OPERATOR MAINTENANCE
MODULAR COMMAND POST SYSTEM (MCPS), SMALL
TROUBLESHOOTING PROCEDURES
INITIAL SETUP
Tools and Special Tools
Personnel Required
None Required
One
Materials/Parts
References
None Required
Equipment Condition
MCPS set up and lighting installed
TROUBLESHOOTING PROCEDURE
SYMPTOM
Frame assemblies (Figure 1, Item 1) will not fit together.
MALFUNCTION
Missing or bent frame components.
Damaged fittings.
CORRECTIVE ACTION
Replace any bent or missing frame components and continue setup as described
1