u.v.w.x.ARMY TM 10-8340-224-13AIR FORCE TO 35E5-6–1NAVY NAVFAC–P-337.ASecure vestibule fabric (3) to vestibule frame (4) withtie tapes.Install a 12–inch steel pin (14) in base plates of endvestibule frame (4) .Identify and install single ply floor (15) and secure withtie tapes (16) to vestibule frame (3) .Install insulated floor (17) on top of single ply floor(15) .Secure with tie tapes (18) .2-20. INSTALL DOUBLE BUMP-THROUGH DOORS IN VESTIBULE OR VESTIBULEADAPTER.If authorized, the bump-through doors may be installedin the vestibule doorway or vestibule adapter.Proceed asfollows to erect doors:a.Stand the double bump-through door (1) up and lock thedoor in the closed position.b.Loosen the set screws (2) on top of doors..--A2-53
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business