TM 10-7360-209-13&PB-3. COLUMN ENTRIES (Continued)or system) to a serviceable condition under typical field operation conditions.this time includes preparation time, troubleshooting time, and quality assurance/quality control time in addition to the time required to perform the specifictasks identified for the maintenance functions authorized in the maintenanceallocation chart.Subcolumns of column 4 are as follows:COperator/CrewO OrganizationalF Direct Supporte.Column 5.Tools and Equipment.Column 5 specifies by code commontool sets (not individual tools) and special tools, test, and support equipmentrequired to perform the designated function.f .Column6.Remarks.Column 6 contains an alphabetic code from theremarks in section IV, Remarks, which is pertinent to the item opposite the particularcode.B-4. TOOL AND TEST EQUIPMENT REQUIREMENTS (SECTION III).a.ToolorTestEquipmentReferenceCode.The numbers in this columncoincide with the numbers used in the tools and equipment column of the MAC.The numbers indicate the applicable tool or test equipment for the maintenancefunctions.b. MaintenanceCategory.The codes in this column indicate the maintenancecategory allocated to the tool or test equipment.c.Nomenclature.This column lists the noun name and nomenclature ofthe tools and test equipment required to perform the maintenance functions.d.NationalStockNumber.This column lists the National/NATO stocknumber of the specific tool or test equipment.e.ToolNumber.This column lists the manufacturer’s part number ofthe tool followed by the Federal Supply Code for manufacturer (5-digit) in parentheses.B-5. REMARKS (SECTION IV).a. ReferenceCode.This code refers to the appropriate item in sectionII, column 6.b. Remarks.This column provides the required explanatory informationnecessary to clarify items appearing in section II.B-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business