TM 10-7360-209-13&P2-6. OPERATING PROCEDURES (Continued).b.Erect the Table Assembly within 6 feet (1.8 meters) of the Heater Tank Assembly. For KCLFF-E, tableassemblies should be separated by approximately five feet (See figure 2-1.1.)c.Place a fire extinguisher in a convenient location near the kitchen.NOTEIf less than 20 trays are to be heated at one time, more than 20 gallons (75.7 liters) of water will beneeded to cover the trays.d.Load the Heater Tank Assembly with 20 gallons (75.7 liters) of water approximately 8 inches (20.3 centimeters)deep.WARNINGThe M2 burner units should be moved a minimum of 50 feet from the KCLFF and KCLFF-E and thefuel storage area prior to servicing.e.Following all precautions and instructions in TM 10-7360204-13&P, start the M2 burner unit Monitor the M2 burnerunit for proper flame color.f.When the M2 burner unit has reached a stable operating state, carefully slide it in the burner rack under theHeater Tank Assembly. Do not force.2-8 Change 3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business