TM 10-7360-208-13&P2-9.PACKAGING (CONT).e.BurnerRack,BaseRackandM2BurnerUnits.NOTERequires two persons to lift.(1)Ensure the six M2 burner units are prepared for movement in accordance with TM 10-7360-204-13&P andpara 2-8b.(2)Insert the M2 burner unit (1) into the burner rack (2).(3)Place the bottom of the base rack (3) over the burner rack (2).(4)The remaining two M2 burner units will be packaged; one in the heater tank assembly, the other in thegriddle assembly double burner rack.2-44
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business