TM 10-7360-208-13&P2-9.PACKAGING.All items that must be packaged for movement prior to packing (loading the truck) are listed in Appendix C. Spaceavailable in the steam table body assembly, the heater tank assembly, the tool chest, the five roasting and baking pans,one steam table and griddle frame, the ovens, the storage cabinets, and the burner rack and base is used for packagingother components as described in the paragraphs below.WARNINGSerious injury could occur if heavy equipment is moved/liftedwithout sufficient personnel to do the job. Use proper physicallifting procedures or use a suitable lifting device or dolly. Wearsafety shoes, gloves and other suitable protective clothing.NOTEMFK major components in the packaged configuration weigh upto 245 pounds. Ensure adequate personnel are used to carryand load the equipment on the vehicles.a.StorageRacksAssembly(Three-PieceSet).(a)Remove the shelves (front cover) (1) from the storage rack assembly (2).(b)Disassemble the stacked rack units (3) and place the front cover (1) on each storage rack assembly(2).2-39
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business