TM 10-5411-201-14T.O. 35E4-178-12-12. SHELTER EXPANSIONNOTEl Four personnel are required to perform the following procedures.l If ground is soft, place wood planks or boards on ground under each shelter cornerbefore detaching lifting equipment.a. Remove four container lift jacks from inside of personnel and right cargo doors by turning locking handle toloosen jack attachment insert and removing safety pin.b. Position jacks at each corner of shelter.NOTEStencil on jack indicates handle rotation to raise or lower jack.c. Rotate handle to raise jack until insert will enter lower ISO fitting and upper jack attachment engages jack sup-port bracket on corner post.d. Turn locking handle to rotate insert in ISO fitting. Install safety pin.e. Repeat steps c and d at three remaining corner posts.2-20Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business