TM 10-5411-201-14T.O. 35E4-178-1Section IV.PREPARATION FOR STORAGE AND SHIPMENT4-50.PREPARATION FOR STORAGE AND SHIPMENT.The following steps describeprocedures for storing or shipping the shelter.a.Inspection.Inspect the shelter for the following:(1) Make sure all circuit breakers and switches in OFF position.(2) Hake sure circuit breaker panel door is closed.(3) Make sure equipment container is strapped down to shelter floor.(4) Make sure caps are secured on power entry panel receptacles andbinding posts are tightened.(5) Make sure the stop plate in the load balancer is in the downposition and secured with the pin.(6) Make sure all lights and jacks are secured in their stowagepositions.(7) Make sure the foot bolt and chain bolt are secured.(8) Make sure the receptacle outlets are stowed and the roof strutsare secured.(9) Make sure all doors are securely closed.(10) Make sure camlock pin is engaged in hole or corner post.b. Packing.Be sure all components are clean and dry before packing.C A U T I O NUse care when transporting or storing shelter toprevent damage to shelter.c. Care and Storaqefacility.If stored outsinside the shelter.Store shelter in a dry area or a designated supplyde in humid conditions, check quarterly for dampness4-194CHANGE 2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business