TM 10-5411-201-14T.O. 35E4-178-14-31.(cont)3.Inspect for and replace if necessary:a.Missing or damaged components.Corrosion or paint damage.R E P A I R1.Corrosion or paint damage (Refer to paragraph 4-44)2.Replace damaged tie-down ring or strap assembly.INSTALLATION1.2.3.4.5.6.Position draw pull catches (11) on equipment container (3) andsecure with rivets (10).(Refer to paragraph 4-33)Position safety hasp (9) on equipment container (3) and secure withrivets (8).(Refer to paragraph 4-33)Position hinges (7) on equipment container (3) and secure withrivets (6).(Refer to paragraph 4-33)Position chest handles (5) on equipment container (3) and securewith rivets (4).(Refer to paragraph 4-33)Position equipment container (3) on floor panel.Install two tie-down rings (1) at the end of two strap assemblies(2) in holes in floor panel. to secure equipment container (3) tofloor.NOTEThe procedures in paragraphs 4-31 through4-43 are typical and apply for all panelsurfaces.4-32.DRYING WATER-SOAKED AREAS IN PANELS.a.Care shall be taken to prevent water from entering panel corematerial, since it is very difficult to remove.When damage occurs, thepunctured panel skin shall be temporarily protected to prevent entry of wateruntil repair can be made.If water has been allowed to enter panel, the carematerial shall be dried prior to skin repair.b.Position heat lamps around damaged area.Adjust lamps so that panelsurface temperature does not exceed 200°F (93.3°C).c.Allow heat lamps to remain in position until core materialsurrounding damaged area is thoroughly dry.4-153
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business