TM 10-5411-201-14
T.O. 35E4-178-1
4-26.
(cont)
2.
Position upper mobilizer fitting (3) and install lockwashers (2) and
screws (l).
3.
Position level (5) and install rivets (4).
(Refer to paragraph 4-33)
Bond seal (10) in place with adhesive.
(Refer to paragraph 4-41)
4.
INSTALLATION
1.
Apply adhesive before positioning endwall panel.
2.
From outside shelter, position fixed endwall on fixed floor and push
inward until endwall is against corner posts mating surfaces.
3.
Align fixed endwall mounting holes with mounting holes and inserts
in corner posts, fixed roof, fixed floor, and endwall hinge.
NOTE
Align mounting holes at fixed endwall corners
and install bolts.
Check that remaining holes
and inserts are aligned and free from obstructions.
4-129