TM 10-5411-201-14T.O. 35E4-178-14-26.(cont)2.Position upper mobilizer fitting (3) and install lockwashers (2) andscrews (l).3.Position level (5) and install rivets (4).(Refer to paragraph 4-33)Bond seal (10) in place with adhesive.(Refer to paragraph 4-41)4.INSTALLATION1.Apply adhesive before positioning endwall panel.2.From outside shelter, position fixed endwall on fixed floor and pushinward until endwall is against corner posts mating surfaces.3.Align fixed endwall mounting holes with mounting holes and insertsin corner posts, fixed roof, fixed floor, and endwall hinge.NOTEAlign mounting holes at fixed endwall cornersand install bolts.Check that remaining holesand inserts are aligned and free from obstructions.4-129
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business