TM 10-5411-201-14
T.O. 35E4-178-1
4-20.
(cont)
Hinged Roof Panel
3.
Coat rollers (8) with silicone grease to hold rollers in place and
position rollers in fixed roof hinges.
4.
Lift and support hinged roof (n) in stowed position.
5.
Engage hinge with fixed roof hinges.
6.
Install hinge pins (5, 6, and 7).
Ensure that hinge pins go through
rollers (8) and solar bar rods (10).
7.
Bend each end of hinge pins approximately 15 degrees to prevent
slippage.
8.
Push two handles of solar bar (9) simultaneously to slide hinged
roof back and forth to check freedom of movement.
A L I G N M E NT
Adjust leveling jacks to make sure
positioning marks on hinged roof
and hinged sidewall are properly
aligned.
Alignment marks on hinged
endwall and hinged sidewall must also
align at the same time.
4-88