TM 10-5411-200-14T.O. 35E4-177-12-10.(cont)(4) Operate Dollyset according to Dollyset technical manual toraise shelter to towing height.(5) Connect towing equipment to Dollyset tow bar.(6) When shelter is in desired position, operate Dollyset to lowershelter and remove Dollyset sections.e.Dollyset lifting from ISO fittings.(1) Separate Dollyset sections and prepare for use observing allrecommendations of Dollyset technical manual.(2) Position Dollyset sections at ends of shelter adjacent to ISOfittings at shelter endwalls.(3) Position Dollyset brackets to connect with shelter IS0 fittingsand secure Dollyset to shelter.(4) Operate Dollyset according to Dollyset technical manual toraise shelter to towing height.(5) Connect towing equipment to Dollyset tow bar.(6) When shelter is in desired position, operate Dollyset to lowershelter and remove Dollyset sections.f.Trailer or flatbed transporting.(1) Using four 14-foot chains and four binders, secure shelter totrailer or flatbed as shown in method 1.(2) Using two 20-foot chains and two binders or four 6-foot chainsand two binders, secure shelter to trailer or flatbed as shown in method 2.2-16
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business