TM 10-5411-200-14
T.O. 35E4-177-1
Section III.
SETUP OF SHELTER
2-7.
PREPARATION FOR USE.
Select a site that:
l
Has reasonable maneuvering area for vehicles that will be used for hauling
or hoisting shelter.
l
The terrain is firm, well drained, and relatively free of surface rocks or
stones.
l
The slope of the terrain does not exceed 18 inches (45.7 cm) over the
projected floor area of the expanded shelter.
2-8. SHELTER INVENTORY CHECKS.
a.
Expandable shelters are shipped uncrated.
b.
Inspect shelter for damage incurred during shipment. If shelter has
been damaged, report damage on SF361, Transportation Discrepancy Report.
Check equipment against packing list to see if shipment is complete.
Report all discrepancies in accordance with instructions of DA PAM 738-750.
d.
Inspect shelter (stowed mode) in accordance with paragraph 2-9.
2-9.
SHELTER INSPECTION CHECKLIST
LOCATION
ITEM
ACTION
1. Fixed personnel
a.
endwall
b.
co
Power entry panel
Inspect connectors for
damage.
Identification and
Check for legibility or
instruction plates
missing plates.
Personnel door
Check for security and
condition of door, locks,
seals, and vent.
CHANGE 2
2-11
