TM 10-5411-200-14
T.O. 35E4-177-1
4-27.
(cont)
2.
Lift stop plates (1) from support cables (2) on both load balancers
(3) mounted on fixed roof.
3.
Lift hinged floor until almost closed then lower stop plate (1) to
remove weight from support cables (2) and secure hinged floor in
this position.
4.
Remove screw (4) from cable guide bracket (5) and disengage support
cable (2).
W A R N I NG
Do not attempt to disassemble or repair load balancer.
This item is a spring powered mechanism and injury or
death to personnel may result if opened. Never completely
release all the tension from the reel assembly or the
cable wrapped around the drum will become tangled.
5.
Return floor to stowed position.
6.
Remove screws (6) securing roller assembly (7) to corner post (8).
7.
Remove screws (9), lockwashers (10), and washers (11) securing
roller assembly (12), plate (13), and seal (14) to endwall hinge
(15) .
8.
Support load balancer (3) and remove screws (16), lockwashers (17),
and washers (18).
4-134