TM 10-5411-200-14
T.O. 35E4-177-1
4-27.
ROOF PANEL ASSEMBLY REPAIR
This task covers:
a.
Removal
d.
Repair
b.
Disassembly
e. Assembly
c.
Cleaning, Inspection
f.
Installation
INITIAL SETUP
Special tools
Personnel - 4
Hand blind riveter, Appendix B, Item 2
Materials
Standard tools
Adhesive, Item 2, Appendix E
General mechanics tool kit
Adhesive, Item 3, Appendix E
R E M O V AL
Load Balancer and Cable Asssembly
NOTE
Letters locate detail
views described in
following procedures
WARNING
Prior to removing load balancer from fixed roof, the
hinged floor must be in stowed position with stop
plate in down position to remove tension from support
cable.
The support cable bracket on hinged floor
must then be removed to permit disconnecting support
cable from hinged floor.
Secure hinged floor to
prevent accidental release.
1.
Lower hinged sidewall to hinged floor in accordance with paragraph
2-16.
4-133