TM 10-5411-200-14
T.O. 35E4-177-1
4-17.
PERSONNEL AND RIGHT CARGO DOOR REPLACEMENT, REPAIR, AND ALIGNMENT
This task covers:
a. Removal
e.
Assembly
b.
Disassembly
f.
Installation
c. Cleaning, Inspection
g.
Alignment
d.
Repair
INITIAL SETUP
Special tools
Materials
Hand blind riveter, Appendix B, Item 2
Sealing compound, Item 19,
Personnel - 2
Appendix E
Standard tools
General mechanics tool kit
REMOVAL
Personnel and Right Cargo Door
1.
Remove hairpin (1), and pin (2),
and swing back bracket (3).
2.
Close door (4).
3.
Remove four bolts (5), lockwashers
(6), and washers (7) securing each of
four hinge base plates (8) to endwall.
Door Vent
4.
Drill out rivets (9) and remove four vent retainer strips (10).
(Refer to paragraph 4-32)
5.
Drill out rivets (11) and remove retainer strip (12) and rain strip
(13).
(Refer to paragraph 4-32)
6.
Drill out rivets (14) and remove door vent (15).
(Refer to paragraph 4-32)
4-56