TM 10-5410-284-13&P
TM 10602A-13&P
LIGHTWEIGHT MAINTENANCE ENCLOSURE (LME)
0027 00
POWER DISTRIBUTION BOX
0027 00-8
Remove
Loosen screws (1) holding wires to block assembly (2).
Remove wires from block assembly (2), and tag.
Remove 2 truss head screws (3) and lock washers (4) holding distribution block (2) to panel.
Slide distribution block from panel. (Slide to side)
Install
Slide new distribution block in from side.
Re-secure 2 truss head screws (3) and lock washers (4) holding distribution (2) block to panel.
Re-attach tagged wires to distribution block by tightening screws (1).
END OF WORK PACKAGE