TM 10-5410-284-13&P
TM 10602A-13&P
LIGHTWEIGHT MAINTENANCE ENCLOSURE (LME)
0027 00
POWER DISTRIBUTION BOX
0027 00-1
WARNING
WARNING
THIS SECTION COVERS:
Inspect, Replace, Test, Repair
INITIAL SETUP
Power Distribution Box in container, or in operation
Maintenance Level
Direct Support
Materials/Parts Tags,(WP0045 item 5))
Tools and Special Tools
Tool Kit, General Mechanics (WP 0029, Table 0027-2, Item 3)
Multimeter (WP 0029, Table 0027 -2, Item 4)
GENERAL
This procedure contains information and instructions to keep the LME power distribution box in good
working order by inspecting, testing, repairing or replacing the entire power distribution box assembly.
Lethal voltage is present when the power distribution box is connected to
a power source. Disconnect the power source before affecting any
repairs to the box. Serious injury or death to personnel may result from
touching any component under power.
INSPECT
Inspect the power distribution box components for proper operation, including condition of circuit
breakers (1), power receptacles (2), LIGHTS switch (3), power cord (4),terminal block (5) and power
distribution block (6).
REPLACE
Replace a damaged power distribution box that has sustained damage and does not operate properly.
Replace an inoperative circuit breaker, GFCI receptacle, or light switch as required.
Lethal voltage is present when the power distribution box is connected to
a power source. Disconnect the power source before testing any
component of the power distribution box. Serious injury or death to
personnel may result from touching any component under power.