TM 10-5410-229-13&P
5-10.
REPAIR FIELD TABLE
- Cont’d
(2) Install Brace.
(a)
Align new brace (2) with rivet holes in top weldment (3), and leg weldment (4).
(b)
Install rivets (1). (See paragraph 5-6.b. for rivet replacement procedures.)
5-11.
TEST AND REPAIR LIGHT SET, Type II
This task covers:
a.
Test Ballast Assembly
b.
Remove and Install
Ballast
Assembly
c.
Remove and Install Female Cable Assembly
d.
Remove and Install Male Cable Assembly
e.
Remove and Install Switch
f.
Remove and Install
Fuseholder
g.
Remove and
Install Handles
, Hinges, and
Latches
INITIAL SETUP
Tools:
Tool Kit, Common Number 1 (Appendix B, Section III, Item 7)
Multimeter
(Appendix B, Section III, Item 4)
Materials/Parts:
Ballast
Assembly (Appendix C, Figure 5, Item 27)
Cable Assembly, Female (Appendix C, Figure 5, Item 10)
Cable Assembly, Male (Appendix C, Figure 5, Item 18)
Fuseholder
(Appendix C, Figure 5, Item 21)
Handle (Appendix C, Figure 6, Item 2)
Hinge (Appendix C, Figure 6, Item 3)
Latch (Appendix C, Figure 6, Item 1)
Switch (Appendix C, Figure 5, Item 23)
5-8