degrees down. Each cable connects through a hole
Driving head and holding handle must be
in the center structure frame member (see detail A,
used when driving an anchor.
(e) Drive anchor approximately 3 feet into
(3) Installation of sidewall anchors. Install
ground.
two anchors at each sidewall so that when cables
(f) Remove driving head, holding handle,
are connected to shelter at locations shown in
and driving rod.
45 degrees down. Screw tie-down rings into bottom
(g) Set anchor by forming a loop in cable
end (secure loop with cable clamp). Insert driving
of foldout floors on foldout end wall sides at
rod through this loop and pull up sharply, assuring
anchor has been set. Remove clamp, attach cable
c. Ground Rod Installation. Drive ground rod
into the earth at a suitable location that permits
ground cable attached to the rod to reach the
NOTE
ground stud (El) on the power entrance panel.
This setting of the anchor is required to turn the
anchor in the ground so that it develops maximum
Attach ground cable to ground stud (E1).
holding power.
(2) Installation of eight center structure
Make certain that power cable is not
anchors.
connected to power entrance panel. Turn
(a) Install two anchors on each side of
all circuit breakers on circuit breaker panel
center structure, straight out from holes in angle
to the off position.
under floor pallet, so that cables, when attached,
d. Light Fixture Installation. The installation of
light fixtures is as follows:
(b) Install two more anchors on each side of
(1) Pull out quick-release pin from holding
center structure so that cables attached between
bracket which secures a ceiling light that is to be
shelter and anchor are 30 degrees to wall and 45
3-14