TM 10-5410-223-14/1
Table 2-1. Consumable Supplies.
(4)
(3)
(2)
(1)
National
Stock
Unit
Number
Description
Item
Qt
1357
Adhesive (contact cement)
Gal
Toluene
1 in, (2.5cm) W x 1 in.
Brushes
(4.4cm)
Paper Towels
(Kim Wipes)
Enamel, Semi gloss pale
Color No. 24554 or equal
green
TT-E-529
Color No. 34087
Enamel Flat,
TT-E-527
Olive drab
889351-61 (26533)
Paddle, mixing coated cloth
(OG 8 black)
7350-00-178-6784
Mixing cup
Talc lubricant
EC 7763MCO
Sealant
8040-00-042-8761
Epoxy
1 qt.
Bostik 1007P
8040-00-598-6164
Adheeive primer
(.95 liters)
Zipper ease
Section II. OPERATION UNDER UNUSUAL CONDITIONS
2-10. Operation in Snow and Ice
2-5. Operation in Extreme Cold
Procedures for operation in snow and ice areas as
a. Check fabric enclosure to ensure weather seal at
follows:
windows is closed.
a. Sweep snow from exterior of shelter with a soft
b. Close and secure door.
bristled brush or broom.
c. Install window panel inserts.
b. When ice build-up exists on exterior of shelter,
2-6. Operation in Extreme Heat
apply bleed air and/or hot air from a utility
No special operations required.
2-7. Operation in Dusty or Sandy Areas
2-11. Operation in Mud
No special operations required.
When muddy conditions exist proper leveling may
become a factor. Continuous checks of levels and
2-8. Operation Under Rainy or Humid Conditions
adjustments to leveling jacks should be made as
Procedures for operation under rainy conditions as
required.
follows:
2-12. Operation at High Altitudes
a. Provide adequate drainage ditches to
prevent
No special operations required.
standing water in area.
b. Check fabric enclosure to ensure weather seal
2-13. Operation in High Winds
at window is closed.
Procedures for operation during high wind con-
c. Close and secure door.
ditions are as follows:
d. Install window panel inserts.
a. Check fabric enclosure to ensure weather seal at
2-9. Operation in Salt Water Areas
windows are closed.
No special operations required.
b. Close and secure the door.
c. Install window panel inserts.
2-7