TM 10-5410-221-24
Section II. MAINTENANCE ALLOCATION CHART (MAC) FOR
SHELTER, EXPANADBLE, RIGID CONSTRUCTION W/AIR-LOCK - continued
(1)
(2)
(3)
(4)
(5)
(6)
GROUP
COMPONENT/
MAINTENANCE
MAINTENANCE LEVEL
TOOLS AND
REMARKS
NUMBER
ASSEMBLY
FUNCTION
EQUIPMENT
CODE
REFERENCE
FIELD
SUSTAINMENT
CODE
DIRECT
GENERAL
DEPOT
UNIT
SUPPORT
SUPPORT
C
O
F
H
D
55
PUMPS
5505
WATER
Inspect
0.2
DISCHARGE
Test
0.2
SYSTEM
Service
0.2
Repair
0.5
Overhaul
1.0
59
WATER SUPPLY
SYSTEM
5900
WATER SUPPLY
Inspect
0.2
SYSTEM
Test
0.2
Service
0.2
Repair
0.5
Overhaul
1.0
Section III. TOOLS AND TEST EQUIPMENT REQUIREMENTS FOR
SHELTER, EXPANADBLE, RIGID CONSTRUCTION W/AIR-LOCK
(1)
(2)
(3)
(4)
(5)
TOOL OR TEST
MAINTENANCE
NOMENCLATURE
NATIONAL STOCK
TOOL NUMBER
EQUIPMENT
LEVEL
NUMBER
REFERENCE
CODE
1
O, F, H
Pop Rivet Tools plier type with 1/8
in. and 3/16 in. diameter heads for
application of 1/8 in. and 3/16 in.
diameter pop rivets.
Section IV. REMARKS FOR SHELTER, EXPANADBLE, RIGID CONSTRUCTION W/AIR-LOCK
(1)
(2)
REMARKS
REMARKS
CODE
A
All seal to prevent air leakage must be replaced every 12 months. Plus the entire shelter will be
repainted interior and exterior.
B
Machine sewing at direct support level for the air-lock assembly.
Change 6