TM 10-5410-221-14/1
(3) Press cover (42) on terminal board (45).
NOTE
Mark or otherwise identify electrical
leads for ease at installation.
6-43. Terminal Board (68, Fig. 6-7, Sheet 2 of 5)
(3) Remove nuts (66) and screws (67) which secure
NOTE
the termiboard (68) to the distribution box.
The following removal procedures apply
b. Installation. Using figure 6-7 as a guide, install
to shelter serial No. 1 thru 184 only.
terminal board as follows:
(1) Position terminal board (68, fig. 6-7, sheet 2 of
a. Removable. Remove terminal board (68, fig. 6-7,
5) in distribution box and secure with nuts (66) and
sheet 2 of 5) according to sequence of index numbers
screws (67).
assigned to figure 6-7 and observing the following.
(2) Replace electrical leads on proper terminals and
(1) Remove cover (65, fig. 6-7, sheet 2 of 5) from
secure with washers (71), lockwashers(70)and nuts (69).
terminal board (68).
(3) Press cover (65) firmly in place over terminal
board (68).
washers (71), and remove electrical leads from terminals
1 through 6.
Change 1 6-46