TM 10-5410-221-14/1
assigned to figure 6-7 and observing the following.
6-41. Terminal Board (28, Fig. 6-7, Sheet 2 of 5)
(1) Remove cover (57, fig. 6-7, sheet2 of 5) from
terminal board ((6)).
a. Removal. Remove terminal board (28, fig. 6-7,
sheet 2 of 5) according to sequence of index numbers
washers (55), and remove electrical leads from terminals
assigned to figure 6-7 and observing the following.
1 through 5.
(1) Remove cover (25, fig. 6-7, sheet 2 of 5) from
NOTE
terminal board (28).
Mark or otherwise identify electrical
leads for ease at installation.
washers (31), and remove electrical leads front terminals
1 through 5.
(3) Remove nuts (58) and screws (59) which secure
NOTE
the terminal board (6(0) to the distribution box.
Mark or otherwise identify electrical
b. Installation. Install terminal board (60, fig. 6-7,
leads for ease at installation.
sheet 2 of 5) using figure 6-7 as a guide and observing
the following:
(3) Remove connector link (32) from terminals.
(1) Position terminal board (60, fig. 6-7, sheet 2 of
(4) Remove nuts (26) and screws (27) which secure
5) in distribution box and secure with nuts (58) and
the terminal board (28) to the distribution box.
screws (59).
b. Installation. Using figure 6-7 as a guide, install the
(2) Replace electrical leads on proper terminals and
terminal board as follows:
secure with washer (55), lockwasher (541) and nut (53).
(1) Position terminal .)board (28, fig. 6-7. sheet 2 of
(3) Press terminal board cover (57) on terminal
5) in distribution box and secure with nuts (26) and
board.
screw(27).
(2) Place connector link (32) over terminals on
terminal board.
(3) Replace electrical leads on p roper terminals
a. Removal. Remove terminal board (38, fig. 6-7,
and secure with washer (31), lockwasher (30) and nut
sheet 2 of 5) according to sequence of index numbers
(29).
assigned to figure (i-7 and observing the following:(1)
(4) Press cover (25) over terminal board (28).
Remove cover (35, fig. 6-7, sheet 2 of 5) from terminal
board (38).
6-42. Terminal Board (45, Fig. 6-7, Sheet 2 of 5)
a. Removal. Remove terminal board (45, fig. 6-7,
washers (31), and remove electrical leads from terminals
sheet 2 of 5) according to sequence of index numbers
1 through 5.
assigned to figure 6-7 and observing the following.
NOTE
(1) Remove cover (42, fig. 6-7, sheet 2 of 5) from
Mark or otherwise identify electrical
terminal board (45).
leads for ease at installation.
washers (48), and remove electrical leads from terminals
(3) Remove connector link (32) from terminals.
2 through 10.
(4) Remove nuts (36) and screws (37) which secure
NOTE
the terminal board (38) to the distribution box.
Mark or otherwise identify electrical
b. Installation. Install terminal board (38, fig. 6-7,
leads for ease at installation.
sheet 2 of 5) using figure 6-7 as a guide and observing
the following:
(3) Remove nuts (43) and screws (44) which secure
(1) Position terminal board (38, fig. 6-7, sheet2 of 5)
the terminal board (-15) to the distribution box.
in distribution box and secure with nuts (36) and screws
b. Installation. Using figure 6-7 as a guide, install
(37).
terminal board as follows:
(2) Place connector link (32) over terminals on
(1) Position terminal board (45, fig. 6-7, sheet2 of 5)
terminal board.
in distribution box and secure with nuts (43) and screws
(3) Replace electrical leads on proper terminals and
(44).
secure with washer (31), lockwasher (30) and nut (29).
(2) Replace electrical leads on proper terminals and
(4) Press cover (35) on terminal board (38).
(46).
6-45