TM 9-2330-275-14&P
2-13. LEVELING SHELTER (Cont).
point
2-14.
(1) Releaseupportstrut clamp (5) at point to be lowered. Make sure support strut (6) buckles at pivot
(2) Level shelter (1) front to rear by slowly opening two lifting-leveling jack valves (7) at high end.
(3) Level shelter (1) left to right by slowly opening two lifting-leveling jack valves (7) at high side.
(4) Close two lifting-leveling jack valves (7) when shelter (1) is level.
WARNING
Make sure struts are Iocked in position before moving dolly set, Failure to do so may
result In injury or death to personnel.
COUPLING DOLLY SET WITH SHELTER TO TOWING VEHICLE.
a.
Connect air hose quick-disconnect connector (1) to rear power cluster (2).
2-31