• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLY AND INSTALLATION INSTRUCTIONS - Contd - TM-10-5410-229-13P_52
ASSEMBLY AND INSTALLATION INSTRUCTIONS - Contd - TM-10-5410-229-13P_54

TM-10-5410-229-13P Modular Command Post System (MCPS) Green NSN 5410-01-323-2454 Tan NSN 5410-01-334-7529 Manual
Page Navigation
  36    37    38    39    40  41  42    43    44    45    46  
TM 10-5410-229-13&P 2-6. ASSEMBLY AND INSTALLATION INSTRUCTIONS - Cont’d (a) Unfold the wall assembly (1) stretch it out and position it so that the pile fastener strip (2) faces the hook fastener strip (3) on the roof cap (4) and the quick release fasteners (5) are on the inside. (b) The wall assembly (1) attaches to the inside of the roof cap (4)  using  quick  release  fasteners  (5)  first and then the hook (3) and pile (2) fastener.  Standing inside the tent, line the wall assembly (1) up and fasten it to the roof cap (4) with the quick release fasteners (5).  The order in which you fasten the quick release fasteners doesn’t matter, as long as they are lined up.  Make sure the leg assemblies (6) stay inside the tent.  Take care to keep the hook (3) and pile (2) fasteners apart until quick release fasteners (5) are fastened. (c) From inside the MCPS, starting in the center of the wall assembly (1), line up the pile (2) fastener strip on  the  wall  assembly  (1)  with  the  hook  fastener  (3)  on  the  roof  cap  assembly  (4)  and  press  them together.  Work from the center toward each end in order to prevent wrinkles in the hook (3) and pile (2) fastener strips. (6) Entrance Way Set-Up.  The entrance way provides blackout protection as well as protection from inclement weather.  Set up the entrance way as follows: 2-27







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.