• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLY AND INSTALLATION INSTRUCTIONS - Contd - TM-10-5410-229-13P_49
ASSEMBLY AND INSTALLATION INSTRUCTIONS - Contd - TM-10-5410-229-13P_51

TM-10-5410-229-13P Modular Command Post System (MCPS) Green NSN 5410-01-323-2454 Tan NSN 5410-01-334-7529 Manual
Page Navigation
  33    34    35    36    37  38  39    40    41    42    43  
TM 10-5410-229-13&P 2-6.  ASSEMBLY AND INSTALLATION INSTRUCTIONS - Cont’d through the "D" ring (4).  Press the hook and pile fastener to secure. (3) Repeat above steps (1) and (2) for second luminaire, ensuring that male and female electrical connectors are facing each other. (4) Connect the female electrical connector (5) of one luminaire to the male electrical connector (6) of the other luminaire.  (A maximum of 12 luminaires may be joined.) (5) Leave a male electrical connector (6) available for connection to the power source. g. Extending  the  frame  to  its  full  height.    Before  attaching  the  walls,  it  is  necessary  to  extend  the  tent  frame  to  a convenient working height.  Proceed as follows:  2-24 CAUTION When handling tent frame do not twist or turn.  Damage to frame can result. 2-24







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.