TM 10-5410-221-24
(5) Seal all cracks around hinge edge using sealant
replacement procedure described in para-
PRC 611, Products Research Co. Burbank, California,
graph 222c.
or equivalent.
(3) Install the adhesive backed Mylar tape (1)
to hinge joint. (Mylar tape is sup-plied with the shelter
g. Installation. Install the folding floor panel
repair kit.)
(4) Replace the grounding straps between the
assembly in reverse order of removal and observing the
fixed floor panel and the folding floor panel.
following.
(5) Engage all latches which secure the
folding floor panel to the folding end and side panels.
floor hinge half and insert the hinge pin (4).
(2) Rivet the seal (8) to the folding floor and
the fixed floor panels using rivet
10-14