TM 9-4931-374-13&P
3-287
Reassembly, test procedures, and installation procedures for
Equipment Conditions
cable adapter assembly.
3-287
Removal and disassembly procedures for cable adapter
2-17
Circuit breaker on power distribution panel must be in OFF
assembly.
position (task no. 2 and 3).
3-324
Reassembly, test procedures, and installation procedures for
2-17
120/208V cable assembly disconnected at shop set (task no.
120/208V cable assembly.
2) 3-46 Electrical installation removed (task no. 4, 6, and 24).
3-324
Removal and disassembly procedures for 120/208V cable
3-115
Conduit installation removed (task no. 6 and 24).
assembly.
3-246
Shelving assembly removed (task no. 6)
3-344
Repair procedures for 120/208V cable assembly--electrical
2-7
Ventilation fan and mounting panel removed from shelter (task
plug connector (female).
no. 14).
3-346
Repair procedures for 120/208V cable assembly--electrical
2-11
ECU removed from stowing frame assembly (task no. 24 and
plug connector (male).
25).
Troubleshooting References
3-9
The power supply does not operate.
3-7
There is no electrical power at outlets.
3-9
There is no electrical power at work table outlets.
3-7
Lights fail to come on.
3-8
Environmental control units or exhaust fans do not operate
correctly.
3-13