TM 9-4931-374-13&P
Section II. OPERATION UNDER USUAL CONDITIONS
2-3. INTRODUCTION
2-4. ASSEMBLY AND PREPARATION FOR USE
CAUTION
NOTE
Never attempt to move or lift the shop set
When
removing
tiedown
and
mounting
without first putting it in the stowed condition.
hardware, ensure all items are stored in the
storage chest as they will be used again.
NOTE
The left and right table refer to the two tables as
viewed looking inside from the cargo door. This
applies throughout chapter 2.
a. This chapter gives information and procedures for preparing the fire
control repair shop set for operation (assembly and preparation for use) and
putting the shop set in the stowed condition (p 2-16, preparation for
movement).
b. Procedures for lifting the shelter, leveling the shelter,
installing/removing ventilation fans and ECU's, deployment of foldout panels,
a. Deployment of Shelter.
and other operations are contained in TM 10-5410-224-14. Become familiar
with these procedures before operating.
(1) Remove strap (1) holding coiled electrical cable (2) and air
conditioning cable (3) to conduit (4) on wall above personnel
c. Detailed operating instructions for hand tools, shop equipment,
door.
electrical power source, and other components furnished with the shop set, or
(2) Level shelter and deploy foldout panels per TM 10-5410-224-
used with it, are contained in manufacturer's instructions or other TM's.
14.
d. For removal/installation instructions and operating instructions for
(3) Remove ventilation fans from ceiling and install in shelter walls
ventilation fans, refer to TM 10-5410-224-14.
per TM 10-5410-224-14.
e. For removal/installation instructions for ECU's, refer to TM 10-5410-
(4) Refer to TM 10-5410-224-14 and perform any other operations
224-14; for operating procedures, refer to TM 5-4120-243-14.
necessary for complete deployment of the shelter.
(5) Store all mounting hardware in storage chest.
2-7