Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FRONT DOLLY BOOSTER RELAY VALVE REPLACEMENT - cont
FRONT DOLLY PRESSURE PROTECTION VALVE REPLACEMENT - cont
TM-9-2330-390-14P Semitrailer Tank: 5 000 Gallon (Portable Water Dispensining) XM1098 (NSN 2300-01-330-2779) Manual
Page Navigation
369
370
371
372
373
374
375
376
377
378
379
TM 9-2330-390-14&P
4-64.
FRONT DOLLY PRESSURE PROTECTION VALVE REPLACEMENT
This Task Covers:
a.
Removal
b.
Installation
Initial Setup:
Equipment Conditions:
l
Wheels chocked.
l
Air reservoir drained (see paragraph 3-6).
Tools/Test Equipment:
l
General mechanic’s tool kit (Item 30, Appendix G)
Materials/Parts:
l
Antiseize tape (Item 29, Appendix F)
a.
REMOVAL
1.
Disconnect tube assembly (1) from elbow (2).
2.
Remove pressure protection valve (3) with elbow (2) from tee (4).
3.
Remove elbow (2) from pressure protection valve (3).
4-146
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business