TM 9-2330-390-14&P3-6. DRAINING AIR RESERVOIR (Con't).Wear protective eye goggles when opening air reservoir draincock and avoid airstream. Failure to follow this warning may result In eye Injury.c.Open draincock (3) on air reservoir (2). Allow all compressed air and condensation to drain. Leavedraincock open.d.Before operation, close draincock (3) on air reservoir (2).e.Connect intervehicular and intradolly air lines (see paragraph 2-11).3-7. CHECKING AND FILLING HYDRAULIC FLUID.NOTE• Perform this task at both front and rear dolly hydraulic reservolrs.• Dolly set should be lowered to ground with Iift and positioning cylinders fullyretracted to ensure an accurate reading.a.Park dolly set on level ground. If pivotingtray (1) is not level, remove safety pin (4) and hitch pin (5)and unlock pivoting tray lockout brace (2) from lowerbracket (3).3-21
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business