TM 9-2330-379-14&P
OPERATIVE/CREW PREVENTIVE MAINTENANCE CHECKS AND SERVICES
B - Before
D - During
A - After
W - Weekly
INTERVAL
ITEM TO BE INSPECTED
ITEM
PROCEDURE: Check for and have repaired, filled, or
Equipment is Not
NO
B
D
A
W
M
adjusted as needed
Ready/Available If:
10
AIR SPRINGS
Adjust all air springs (1) to the
One or more air
correct pressure for the load being
springs are damaged
carried. Reference page 2-34.
or cannot be inflated
to proper pressure
Payload
Load on
6000 lb.
25 psi
9000 lb.
45 psi
12000 lb.
60 psi
15000 lb.
75 psi
11
AIR RESERVOIRS
WARNING
Wear goggles when opening drain-
One or more air
cock (2) on air reservoirs
reservoirs is damaged
or leaking.
a. Inspect air reservoir for
signs of leakage or damage.
b. Open draincocks (2) and drain
all moisture from reservoirs.
c. Close draincocks
2-20