TM 9-2330-379-14&P
TOWBAR - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
WARNING
Towbar must be fully supported when being
connected to steering link.
11
Steering
Towbar (2) and
a.
Apply coating of grease to surfaces of
link (1)
pin (3)
pin (3).
b.
Line up towbar (2) with steering link (1).
c.
Place pin (3) in position to connect
towbar (2) to steering link (1).
12
Pin (3)
Two bolts (4)
Secure pin (3) in place with two bolts (4)
and two nuts (5)
and two nuts (5).
TASK ENDS HERE
4-164