TM 9-2330-275-14&P
4-21. REAR DISTRIBUTION BOX MAINTENANCE (M832).
a. Removal
d. Assembly
b. Disassembly
e. Installation
c. Cleaning and Inspection
Initial Setup:
Equipment Conditions:
Materials/Parts
l Intervehicular cable disconnected from towing
. Solder (item 13, Appendix E)
vehicle distribution box (pare 2-11).
l Dry cleaning solvent (item 14, Appendix E)
Marker tags (Item 16, Appendix E)
Tools/Test Equipment:
l One bushing
. Two gaskets
l General mechanics tool kit
l Sixteen lockwashers
Common no. 1 shop set
1.
Remove eight screws (8), lockwashers (9), and cover (7) from rear distribution box (13). Discard lockwashers.
2.
Remove four screws (12), washers (15), rear distribution box (13), and spacer (14) from rear dolly.
b.
DISASSEMBLY
1.
Remove retaining nut (11) from rear of connector (4).
2.
Tag and disconnect wires of branched wiring harness (18) from connectors (4 and 23).
3 . R e m o ve branched wiring harness (18) and grommet (17) from cover (7).
4.
Remove four nuts (10), screws(1), lockwashers (2), cover (3), connector (4), bushing (5), and gasket (6) from
cover (7). Discard lockwashers, bushing, and gasket.
4-46
